Dalian Shipai completed the first quarter plan target

In the first quarter of this year, the number of delivery and shipping hosts of Dalian Marine Diesel Engine Co., Ltd. reached 11 units. The company achieved the planned goals and created a good start for the completion of the annual production tasks.
In the first quarter, Dalian Shipai encountered many difficulties in the production of the main engine. For example, if the arrival of the matching parts is not timely, the production preparation work will be more difficult, and the major shipyards will be adjusted continuously. To this end, the company is market-oriented to meet the needs of ship owners and shipyards, strengthen communication with customers, strictly control the pace of production, and rationally arrange production. The company's leaders took the lead in coordinating and solving the supporting problems to ensure the host construction. For example, in the process of constructing 6RTflex68-D diesel engine for Bohai Shipbuilding Heavy Industry Co., Ltd., the main assembly work was slow due to the failure of the crankshaft in the early stage. In order to meet the requirements of the shipyard’s early delivery, under the unified arrangement of the company’s leadership, the crankshaft After the installation work, the assembly shop immediately started the two-shift operation mechanism. From March 8, the host installation and integrity work was completed in only 3 days. The company completed the delivery work within 20 days after the crankshaft arrived, creating the shortest test bench cycle record for the same model.
At the same time, Dalian Shipyard continued to pay close attention to quality management and quality control of the production process. With the 7S80MEC type host assembly opportunity, the company organized relevant departments to start the benchmarking work, requiring all departments to plan, implement, and summarize the benchmarking work, learn from outstanding enterprises, find their own shortcomings, and do the best Process, improve the quality of work, and finally reflect the content of the mark on the drawings. At present, the benchmarking work is proceeding in an orderly manner, and the company strives to push the quality of the host to a new level through this work.
Recently, Dalian Shipai has received notices from major shipyards to urge the mainframes. However, there are still different levels of supporting problems to be delivered to the mainframes. At the same time, it is very difficult to plan the electronic control consoles and the oil-discharging units. Faced with these problems, the company said that it has the determination and confidence to overcome all difficulties, to meet the multi-faceted needs of ship owners and shipyards, and to successfully complete production tasks.

Box Injection Mold and Moldings

Custom Design Box,Plastic Box,Packaging Box

Guantong Plastic Mould Co., Ltd. , http://www.zhymould.com